National Institute of Technology Rourkela

राष्ट्रीय प्रौद्योगिकी संस्थान राउरकेला

ଜାତୀୟ ପ୍ରଯୁକ୍ତି ପ୍ରତିଷ୍ଠାନ ରାଉରକେଲା

An Institute of National Importance

All Publications

Sahendra Ram

Assistant Professor Grade-I
rams@nitrkl.ac.in

A. Kumar, A. K. Singh, S. Ram, A. K. Singh, and R. Singh,"Practical experiences of instrumentation and monitoring for depillaring", in International Conference on Recent Advances in Rock Engineering (A Specialized Conference of the International Society for Rock Mechanics), pp.164-169, November 2016, 10.2991/rare-16.2016.26       Inproceedings
S. Ram, A. K. Singh, D. Kumar, and R. Singh,"Design of roof bolt based breaker line support in a mechanised depillaring panel", in 35th International Conference on Ground Control in Mining, pp.155-161, Morgantown, WV, USA, July 2016       Inproceedings
A. Kumar, S. Ram, A. K. Singh, A. K. Singh, and R. Singh,"A numerical modeling approach for rib/snook design in mechanised depillaring", in 6th Asian Mining Congress, pp.87-96, Kolkata, India, February 2016       Inproceedings
S. Ram, D. Kumar, P. Konicek, A. Singh, R. Kumar, A. Singh, and R. Singh,"Rock mechanics studies during continuous miner based coal pillar extraction in Indian coalfields.", Transactions of MGMI, vol.111, pp.89-104, Kolkata : Mining, Geological, and Metallurgical Institute of India 2015       Article
A. Kumar, S. Ram, and R. Singh,"Rock mechanics considerations for rib/snook design in mechanised depillaring", in International Conference on Engineering Geology in New Millennium (EGNM-2015), vol.special in journal of engineering geology, pp.394-409, Indian Institute of Technology, New Delhi,, October 2015       Inproceedings
R. Singh, S. Ram, A. K. Singh, R. Kumar, and A. K. Singh,"Strata control investigations during fully mechanized coal pillar extraction in Indian coalfields", in 33rd International Conference on Ground Control in Mining (ICGCM), pp.158-164, WVU, Morgantown, USA, July 2014       Inproceedings
S. Ram, A. K. Singh, D. Kumar, and R. Singh,"Roof bolt based breaker-line design during underground coal pillar extraction", in 5th International Colloquium, pp.69-71, June 2014       Inproceedings
A. K. Singh, R. Singh, P. K. Mandal, R. Kumar, A. K. Singh, and S. Ram,"Rock mechanics challenges of depillaring at deep cover", Journal of Mines, Metals and Fuels, vol.57, no.9, pp.298-306, Books & Journals Pvt Ltd. 2009       Article
S. K. Jena, R., T., R. Singh, P. K. Mandal, A. K. Singh, R. Kumar, S. Ram, and A. Singh,"Interaction of ground movement with underground mining of thick and contiguous sections below hill terrain: a case study", Minetech, vol.28, no.2, pp.33-44, Ranchi : Technical Publications Wing, Central Mine Planning & Design Institute 2007       Article
R. Singh, P., A., R. Kumar, S. Ram, and S. K. Jena,"Encountering induced horizontal stress during simultaneous depillaring of thick and contiguous sections below hilly terrain: A case study", MGMI Transaction, vol.102, no.1&2, pp.37-61, Kolkata : Mining, Geological, and Metallurgical Institute of India 2005       Article