A. K. Singh, S. Ram, A. Kumar, P. Waclawik, and R. Kukutsch,"Stability study of coal pillars due to induced stress driven spalling during development and mechanised depillaring at different depths of cover", Canadian Geotechnical Journal 2024, https://doi.org/10.1139/cgj-2024-0114 Article
A. K. Singh, S. Ram, and A. Kumar,"Influence of thickness of weak bedding planes at various positions within pillar height on strength: a numerical modelling study", Archives of Mining Sciences, vol.69, no.3, pp.409-430, Polish Academy of Sciences 2024, 10.24425/ams.2024.151443 Article
J. Anil, K. Kumar, S. Ram, S. Chatterjee, and A. K. Gorai,"Monitoring of subsidence over a continuous miner-based coal mine caving panels using PS-InSAR technique", Mining Metallurgy & Exploration, vol.40, no.3, pp.719-736, Springer, March 2023, 10.1007/s42461-023-00744-y Article
R. Kumar, A. K. Mishra, A. Kumar, A. K. Singh, S. Ram, A. K. Singh, and R. Singh,"Importance of Fracturing Hard and Massive Overlying Strata for Complete Extraction of Thick Coal Seam — Case Studies", Journal of the Geological Society of India (J GEOL SOC INDIA), vol.98, no.2, pp.203-210, Springer 2022, 10.1007/s12594-022-1960-y Article
S. Ram, R. Singh, A. Kumar, A. K. Singh, R. Kumar, A. R. Rao, and V. S. Rao,"Stability assessment of heightened rib/snook during extraction of a thick coal seam by continuous miner in single lift", Geomechanics and Geophysics for Geo-Energy and Geo-Resources, vol.8, no.74, Springer 2022, 10.1007/s40948-022-00378-2 Article
S. Ram, A. Kumar, A. K. Singh, B. K. Thakur, and H. S. Mahato,"Application of numerical modelling in strata control at the goaf edge during pillar extraction from underground coal mine", MGMI News Journal, vol.47, no.4, pp.52-68, MGMI, March 2022 Article
A. K. Singh, A. Kumar, S. Ram, R. Kumar, A. K. Singh, and R. Singh,"INSTRUMENTATION AND MONITORING FOR STRATA CONTROL IN DEPILLARING", MGMI News Journal, vol.47, no.4, pp.39-51, MGMI, March 2022 Article
A. Kumar, A. K. Singh, D. Kumar, S. Ram, R. Kumar, and A. K. Singh,"SUCCESS STORY OF ROOF FALL PREDICTION DURING PILLAR EXTRACTION IN A TRIALED PANEL OF TAWA-II MINE USING CONTINUOUS MINER TECHNOLOGY", in National Conference on Challenges in Safety and Environmental Management in Mines, 17-20 June, 2022, NIT Rourkela, June 2022 Inproceedings
A. K. Singh, S. Ram, P. Waclawik, A. Kumar, and B. K. Thakur,"STABILITY STUDY OF NATURAL SUPPORTS DURING DEVELOPMENT AND DEPILLARING WORKINGS AT DIFFERENT DEPTHS", in National Conference on Challenges in Safety and Environmental Management in Mines 2022 Inproceedings
A. Kumar, S. Ram, D. Kumar, A. K. Singh, R. Kumar, and S. Gorain,"Development of design norms for rib/snook during mechanised depillaring by continuous miner", International Journal of Rock Mechanics and Mining Sciences, vol.161, no.105259, Elsevier, October 2022, 10.1016/j.ijrmms.2022.105259 Article